Top

2 WAY TRAFFIC LIGHTS 2ND APRIL FOR 2 NIGHTS

Underground duct work will take place near Warren House on A35 in Chideock to allow for the maintenance, repair, and installation of the telephone network. This was to take place on 11th March but now moved to 2nd April 2020.

The purpose of this work is to repair existing telephone lines and equipment.

Because of the nature of the work and the speed of the road, it has been necessary to ask for the works to be carried out at the night time only after 6.30 PM

2 way traffic lights with count down signs will be in operation. Every effort to keep disruption to a minimum during this period and we thank you in advance for your patience and assistance. Should you have any issues or comments associated with our works we would be grateful if you would email info@tlucontracts.co.uk
Urgent problems on the day may be resolved by telephoning us on 01823 661104 or 0844 800 4473.